Recent Projects

Recent Projects: 2021


Lime Kiln Main Control Panel



Lime Kiln Remote I/O Panel





Projects: 2019

Ford Livonia, Michigan
250hp VFP panels for Mill water treatment


DTE Chrysler Sterling Heights, Michigan
Installation of BMS Controls


Projects: 2015
Oakland University, Auburn Hills, Michigan –
100MM BTU Hot Water Generator System with a New Control Panel, Gas Train and Field Devices. We were able to complete this project from start to finish in a total of five weeks having a two week outage for installation and start-up. 
  
*****
Michigan Sugar Company, Croswell, Michigan – Removal of a coal boiler (coal boiler was transfered to their Sebewaing plant), and new installation of a natural gas boiler, new Control Panel, Gas Train and Field Devices.  
*****
Michigan Sugar Company, Sebewaing, Michigan – Coal boiler installation and upgrades, new Control Panel and Field Devices.  

Projects: 2014
ProMedica Toledo Hospital, Toledo, Ohio – Retrofit upgrade – new PLC installation and software upgrades for two natural gas boilers and Plant Master Controls.  

Projects: 2013
Michigan Sugar Company, Caro, Michigan – Removal of a coal boiler and installation of an additional natural gas boiler, new Boiler Control Panels and Plant Master Control, VFD Controls, Natural Gas Trains and Field Devices.  

Projects: 2012
Michigan Sugar Company, Bay City, Michigan – New installation of a 200K lb. natural gas boiler, VFD Fan controls and braking panels, gas train and field devices, upgrade Plant Master controls.  
*****
St. Vincent Mercy Hospital, Toledo, Ohio – Two upgraded gas/oil train and controls for 60k lb., 600 PSI boilers to produce electricity and process steam for the hospital. A new Feedwater Control system was also installed to manage the controls for the pumps along with a Plant Master control system.